Sometimes logic takes you places you’d rather not go.

Take, for example, the four fallacies of metrics described in the KJR Manifesto: Measuring the right things wrong, measuring the wrong things (right or wrong), failing to measure important things, and measuring employees.

I’ve been pondering the connection between fallacy #4 and the financial meltdown. It’s a pretty good connection. Fixing it, though, takes us into strange territory. Here goes: